The action is based on a Severity Level III problem consisting of three violations involving: (1) the failure to correct erroneous Technical Specification clarifications after being alerted of their existence by licensee Quality Assurance findings, (2) the continued existence of an erroneous Technical Specification clarification after being informed by the NRC that it was incorrect, and (3) an unauthorized change to the Technical Specifications.